Building type School
Building age 1915-2000
Location
Cost of work
District Waveney
Features Biomass Boiler

Suffolk County Council installed a 85kW biomass boiler in Harbour PRU in 2009.

Biomass boilers that use locally grown wood chips for generating space heating and hot water, offer significant potential for carbon reductions, especially when they are used to replace oil-fired boilers, or even electric heating. Suffolk County Council has installed in the region of 4MW of biomass boiler capacity over the last 4 years encompassing  approximately 20 school sites. This overall capacity will deliver approximately 4440 MWh of renewable heat each year (enough to heat over 200 typical family homes) and will result in an annual carbon reduction in carbon emissions in the region of 1,600 tonnes.

Biomass installations to-date have been funded through  various bio-energy grant schemes however, moving forward future installations will be designed to be  eligible for annual renewable-heat payments under the Government’s renewable-heat-incentive (RHI) scheme.


Sustainability Features

 


Design Process

 


Grants

 


Green Lifestyle

 


Evaluation

 


Suppliers and Professional Services Used

 


Awards